螯合沉淀法处理燃煤电厂脱硫废水 被引量:2

Treatment of Desulfurization Wastewater of Coal-fired Power Plants by Chelation-precipitation Process
下载PDF
导出
摘要 采用螯合沉淀法,选用重金属离子捕集沉淀剂DTCR,对某燃煤电厂的烟气脱硫废水进行了重金属处理,结果表明,出水总Hg为0.004mg/L,总Cd为0.003mg/L,总Pb为0.013 mg/L,总Ni为0.02 mg/L,总Cu为0.012mg/L,总Zn为0.034 mg/L,达到《污水综合排放标准》(GB8979-1996)要求。 Desulfurization wastewater containing heavy metals of coal - fired power plants was treated by chelation- precipitation process. The heavy metal capturing and precipitation agent was used to treat wastewater. The results showed that the effluent quality could reach the integrated wastewater discharge standard ( GB8979 - 1996) , with Hg 0. 004mg/L, Cd 0. 003mg/L, Pb 0. 013 mg/L, Ni 0. 02 mg/L, Cu 0. 012mg/L,Zn 0. 034 mg/L.
作者 李东升 王杰
出处 《山东化工》 CAS 2010年第11期40-42,共3页 Shandong Chemical Industry
关键词 螯合沉淀 DTCR 燃煤电厂脱硫废水 chelation - precipitation DTCR desulfurization wastewater of coal - fired power plants
  • 相关文献

参考文献3

二级参考文献38

共引文献68

同被引文献15

引证文献2

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部