期刊文献+

建筑外墙节能质量管理问题探析及对策研究 被引量:5

Analysis and Countermeasure on Quality Management of Energy Saving about Building Exterior Wall in Whole Construction Process
下载PDF
导出
摘要 建筑外墙节能质量是保证和实现建筑节能效果的核心内容。施工全过程建筑外墙节能质量问题主要包括设计审核不规范、材料检验不合格、图纸会审不全面、投入把关不足、工艺控制不严、新型工艺使用准入审核缺乏、缺乏成品保护意识、竣工验收控制不严、保修责任模糊和寿命周期后管理缺失等10个方面;基于施工全过程建筑外墙节能工程质量影响因素及对其内在本质剖析,从加强节能设计审核、优化施工组织设计、发挥人的主导作用、强化过程动态控制、建立健全管理制度等5个方面,提出改善建筑外墙节能工程质量管理的策略,以促进建筑节能质量管理水平的整体提升。 Energy-saving of building exterior wall is the core issue of implementing the effect of energy efficiency.In the whole construction process,the main shortcomings of energy-saving quality about building exterior wall include that energy-saving design is unreasonable,material inspection is unqualified,examination of working drawing is not overall,input and the process control is not strictly,new-type technology lacks of authentication,both the control of finished product and final acceptance are not strict,responsibility of guarantee repair blurs,management after the life-cycle losses and so on.Based on the deeply analysis on factors affecting and essence of quality problem of energy-saving in whole construction process,measures and strategies are proposed to improve quality management and promote the whole level of quality management in energy-saving from five perspectives,such as enhancing audit of energy-saving design,optimizing construction organization design,playing the leading role of peers,emphasizing process control,establishing and perfecting management system.
出处 《建筑节能》 CAS 2010年第11期67-71,共5页 BUILDING ENERGY EFFICIENCY
基金 天津市城乡建设和交通委员会软课题:建筑节能服务型企业竞争优势形成与发展研究
关键词 施工全过程 建筑外墙 节能工程 质量管理 问题分析 改进策略 whole construction process exterior walls energy-saving construction quality management problem analysis improvement strategy
  • 相关文献

参考文献6

二级参考文献7

  • 1杨志惠.浅谈创精品工程施工质量控制措施[J].福建建设科技,2007(3):47-48. 被引量:91
  • 2樊启祥 强茂山.模糊综合评价与层次分析法在斜、竖井的导井施工方法优选中的应用[J].土木工程学报(建设工程与管理分册),2002,8:81-86.
  • 3汪应洛,袁治平,孙静春等.系统工程[M].北京:机械工业出版社,2004.249-277.
  • 4D.T.J.O'Sullivan.Improving building operation by tracking performance metrics throughout the building lifecycle[J].Energy and Buildings,2004,(36):1075-1090.
  • 5Chow T T,Fong K F.Energy modeling of district cooling system for new urban development[J].Energy and Buildings,2004,(36):1153-1162.
  • 6万绍联.浅谈项目施工过程中的质量控制[J].科技创新导报,2008,5(13):72-72. 被引量:39
  • 7邬伟彬.浅谈建设工程施工质量管理[J].建材与装饰(下旬),2007,0(8):407-408. 被引量:103

共引文献96

同被引文献32

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部