摘要
地铁站设备联动调试是项目管理的最后一关,直接关系到产品、设备功能和安装质量能否满足地铁站使用功能及各项功能的设计要求,为日后设备在最佳状态下运行创造先决条件,文中实例因涉及多个专业承包商而成为联动调试的一大难点。
The linkage debugging stage is the last pass of this engineering project management. It relates directly to the products,the functions of the equipments and whether the quality of the installment can satisfy the used function of the metro station,whether it can achieve the request of the design function. It will create the preconditions for the best running status of the equipment in the future. Because the metro station involves the multitudinous specialized contractors,the linkage debugging is a big difficulty of this project.
出处
《广东土木与建筑》
2010年第9期43-46,共4页
Guangdong Architecture Civil Engineering
关键词
地铁
联动调试
项目管理
metro
linkage debugging
project management