火电厂脱硫装置高压供电方式的研究

Research of High Voltage Supply Mode for Desulfurization Unit of Power Plant
下载PDF
导出
摘要 以嘉兴电厂二期(4×600 MW)的烟气脱硫技改工程为例,分析了基于脱硫负荷和厂用电负荷所提出的高压引接电源方案,对高厂变的实际真正余量提出了自己的见解,并从建设角度总结了在工程实施中的难点及注意事项。所做分析对于处理同类问题具有一定的实用参考价值。 By taking the flue gas desulfurization project of Jiaxing Power Plant phase 11(4 * 600 MW) as an example, the paper analyzes the high-voltage power tapping form based on the estimation of desulfrization load and auxiliary power load. Own viewpoint was produced according to the actual margin of auxiliary power transformer, some difficulties and attentions in engineering implementation were summarized from the view of construction. The article has some practical reference value for dealing with the same questions.
作者 赵朝阳
出处 《电力科学与工程》 2010年第11期59-61,共3页 Electric Power Science and Engineering
关键词 脱硫装置 负荷计算 高压电源 供电方式 gas desulfurization load estimation high-voltage power supply mode
  • 相关文献

参考文献2

  • 1DL/T 5153-2002,火力发电厂厂用电设计技术规定[S].
  • 2DL/T5196-2004.火力发电厂烟气脱硫设计技术规程[S].[S].,..

共引文献83

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部