摘要
以嘉兴电厂二期(4×600 MW)的烟气脱硫技改工程为例,分析了基于脱硫负荷和厂用电负荷所提出的高压引接电源方案,对高厂变的实际真正余量提出了自己的见解,并从建设角度总结了在工程实施中的难点及注意事项。所做分析对于处理同类问题具有一定的实用参考价值。
By taking the flue gas desulfurization project of Jiaxing Power Plant phase 11(4 * 600 MW) as an example, the paper analyzes the high-voltage power tapping form based on the estimation of desulfrization load and auxiliary power load. Own viewpoint was produced according to the actual margin of auxiliary power transformer, some difficulties and attentions in engineering implementation were summarized from the view of construction. The article has some practical reference value for dealing with the same questions.
出处
《电力科学与工程》
2010年第11期59-61,共3页
Electric Power Science and Engineering
关键词
脱硫装置
负荷计算
高压电源
供电方式
gas desulfurization
load estimation
high-voltage power
supply mode