期刊文献+

构皮滩水电站W_(24)岩溶系统发育特征及工程处理 被引量:2

Development characteristics and engineering treatment measures of W_(24) karst system of Goupitan Hydropower Station
下载PDF
导出
摘要 构皮滩水电站W24岩溶系统规模大,管道复杂多变,形态多样,跨越地下厂房三大洞室区,直接影响洞室围岩稳定与防渗幕体的形成。通过前期与施工期工程地质勘察研究,查明了岩溶系统的空间分布特征,在施工过程中采取多种工程措施进行了处理。其处理原则为:及时对洞室边墙水平距离15 m、顶拱高程以上垂直距离20 m范围以内的所有岩溶管道予以清理,并作回填混凝土处理。 W24 karst system of Goupitan Hydropower Station is characterized by large scale, complicated passage, various styles and crossing 3 chamber areas, which directly affect the stability of surrounding rock of chamber and the formation of anti - seepage curtain. We find out the spatial distribution features of karst system through geological exploration at earlier stage and during construction period, and take various engineering measures in construction. The treatment principle is to clean all the karst passages within the range of 15m in horizontal distance of chamber side wall and 20 m above arch crown elevation in vertical distance and to carry out concrete backfill.
出处 《人民长江》 北大核心 2010年第22期12-15,共4页 Yangtze River
关键词 W24岩溶系统 围岩稳定 防渗帷幕 工程处理 构皮滩水电站 W24 karst system surrounding rock stability anti -seepage curtain engineering treatment Goupitan Hydropower Station
  • 相关文献

同被引文献20

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部