摘要
介绍了应用模糊综合评判法对建筑工程项目风险进行分析的方法,阐述了模糊综合评判的主要步骤,并通过工程实例作了验证分析,从而更加客观的分析和防范建筑工程风险。
The paper introduces the method for the analysis of the architectural engineering program risks by the applied fuzzy comprehensive evaluation method, illustrates the main steps for the fuzzy comprehensive evaluation, and proves and analyzes the engineering examples, so as to have the objective analysis and prevent the architectural project risks.