浅析大跨径连续梁桥悬臂浇筑合龙段施工工艺 被引量:1

Tentative analysis on closer segment construction technology of large-span connected-beam bridge with cantilever site cast construction method
下载PDF
导出
摘要 结合吴忠黄河公路特大桥施工实践,对大跨径连续梁桥合龙段施工工艺进行了介绍,具体阐述了合龙段施工步骤控制措施及配重的选择与参数计算,以指导相关人员加深对连续梁桥合龙段施工中关键工艺的正确理解和熟练应用。 Combining with Wuzhong Yellow river road large Bridge construction practice, this thesis introduces the closer segment construction technology of large-span connected-beam bridge, specifically expounds closer segment construction steps, controlling measures, counterweight selection, and parameter calculation, so as to guide relevant personnel to correctly understand and skillfully apply key technology in continuous beam bridge closer section construction.
作者 武天泽
出处 《山西建筑》 2010年第36期299-300,共2页 Shanxi Architecture
关键词 连续梁桥 合龙段 施工步骤 控制措施 continuous girder bridge, closer section, construction steps, controlling measures
  • 相关文献

参考文献3

二级参考文献8

共引文献7

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部