期刊文献+

平阳高速公路盂县段建设项目水资源论证

Water resources demonstration of construction project in Yuxian section of Ping-Yang highway
下载PDF
导出
摘要 在综合分析平阳高速公路盂县段建设项目区域水资源状况等的基础上,确定了建设项目水资源论证等级及论证范围,进行了建设项目取用水合理性分析,论证了取水水源,分析了取退水的影响,结果表明,建设项目取用水合理,取水水源是可靠和可行的,项目取水对区域水资源和其他用户无影响,项目退水对周边影响小。 On the basis of comprehensively analysing the regional water resources condition in Yuxian section of Ping-Yang highway construction project, the level and the scope of water resources demonstration of construction project were determined, the rationality analysis of water intake and use were carried out, the water source was demonstrated and the impact of fetch and return water were analyzed. The result indicated that the water intake and use of construction project is reasonable, the water source is reliable and practicable, the water fetch has no influence on the regional water resources and other users, the water return has little influence to periphery environment.
作者 王健
出处 《山西建筑》 2010年第36期362-363,共2页 Shanxi Architecture
关键词 高速公路 水资源论证 建设项目 水源 highway, water resources demonstration, construction project, water source
  • 相关文献

参考文献4

二级参考文献29

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部