摘要
文章通过对蒙古国图木尔廷—敖包锌矿南部水源地水文、气象、地质构造及地下水的补给、径流、排泄条件的分析与研究,利用勘探成果和抽水试验资料,圈定了洼地一带作为成井区段,以袭夺潜水蒸发量为地下水开采量。通过数值模拟法评价水源地地下水天然资源量和可采资源量,找到了满足矿山生产用水的理想水源地。
Based on analyzing the hydrology, meteorology, geological structure and groundwater conditions of supply, runoff and drainage in the south of Tumuerting- Aobao zinc deposit, Mongolia, this paper outlines a well area in depression by utilizing the ore deposit exploration fruit and pumping - out test data, in order to pirate produced quantity from evaporation capacity of phreatic water. The natural resources and exploitable resources of groundwater are evaluated by numerical simulation in the paper, thus it has been found an ideal waterhead area for mine processwater.
出处
《矿产勘查》
2010年第6期536-540,共5页
Mineral Exploration