无裂缝混凝土大坝施工技术与实践 被引量:7

Construction Technology and Practice for No Crack Concrete Dam
下载PDF
导出
摘要 对混凝土坝来说,裂缝是常见的现象,混凝土大坝裂缝问题的解决是坝工界的一项重大课题。三峡三期大坝在一、二期大坝混凝土施工的基础上,认真总结各方面的经验和教训,从混凝土施工全过程的每一个环节精细研究、改进、试验、创新,创造了一套特有的施工技术和施工工艺,经过在工程中的全面应用,取得了令人满意的效果,并创造了无裂缝混凝土重力坝的世界奇迹。 The emergence of crack for concrete dam is a common phenomenon,and the solution to this problem is a major challenge in the world.On the basis of summing up the construction experiences of the first and second phase dam of the Three Gorges Project,a set of specific construction technology and process for the construction of the third phase dam of Three Gorges Project is created after fine studies,improvement,testing and innovation from all aspects of construction.The application of these technology and process in the third phase construction of the Three Gorges Project has achieved a satisfactory result.No crack is found on the third phase dam and it is a wonder in the construction of gravity dam in the world.
作者 周厚贵
出处 《水力发电》 北大核心 2010年第2期1-4,16,共5页 Water Power
关键词 混凝土施工 无裂缝大坝 施工技术 施工工艺 三峡三期大坝 concrete construction no crack dam construction technology construction process Three Gorges phase III dam
  • 相关文献

参考文献4

二级参考文献5

共引文献8

同被引文献53

引证文献7

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部