摘要
碾压混凝土大坝工程中,在大坝上、下游坝面模板位置,廊道固边以及振动碾碾压不到的地方常采用变态混凝土。变态混凝土施工包括铺料、加浆、振捣等过程,以云龙河三级水电站大坝变态混凝土施工为例,介绍了新的加浆施工工艺,并总结了变态混凝土施工的要点,可为类似工程提供参考。
Metamorphosis concrete is often used in the upstream and downstream dam surface formwork location,the perimeter concrete of the gallery,and the places not being rolled by vibration roller in the construction of RCC dam.In this paper,the metamorphosis concrete construction and new construction process for RCC dam of Yunlong River Hydropower Station III are described.
出处
《水力发电》
北大核心
2010年第2期46-47,共2页
Water Power
关键词
变态混凝土
碾压混凝土
施工
云龙河三级水电站
metamorphosis concrete
roller compacted concrete
construction
Yunlong River III Hydropower Station