摘要
随着钢管混凝土拱桥的应用推广,它的施工问题日益受到重视,虽已取得了相当的研究成果,且已成为大跨度拱桥建设的首选桥型,但由于其在我国的应用起步较晚,设计和施工都有待于进一步提高,特别是一些细节问题的处理还很不成熟,需要在实践中不断总结和完善。
The construction problems of concrete-filled steel tube arch bridge are increasingly taken into account by technicians along with the application and extension of this bridge.Although it has made considerable research results and become the first selected bridge type for the construction of long span arch bridge,the design and construction of this bridge await further research for the application of it started late in China,especially the treating of some detail problems is not very mature,and needs constantly summarizing and improving during practice.
出处
《交通标准化》
2010年第17期100-102,共3页
Communications Standardization
关键词
钢管混凝土拱桥
设计
施工
concrete-filled steel tube arch bridge
design
construction