摘要
甘肃省引洮供水一期工程总干渠下段暗渠渠基大多位于湿陷性土层中。经现场原位多桩复合地基静载荷试验检测以及湿陷性与渗透性检测,小口径挤密桩施工技术成熟,简单快捷,可供同类工程设计与施工参考。
Yintao River in Gansu Province The total trunk water supply a drainage culvert under the segment- based, mostly in the collapsible soil layer. The multi-pile composite foundation-situ static load test for detection, Small-caliber compaction pile technology is mature, simple and fast, for the design and construction of similar projects for reference.
出处
《中国水利》
北大核心
2010年第22期57-58,60,共3页
China Water Resources
关键词
引洮工程
湿陷性黄土
挤密桩
处理
效果
Yintao engineering
collapsibility loess
compaction pile
treatment
effect