摘要
结合土耳其OBRUK电站水轮机调相运行设计及验证,阐述了调相水轮机设计应注意的关键技术问题。
Combining with the design and proving of the phase-modulation turbine in Turkish OBRUK power station,this paper describes the key technical problems in the design of the phase-modulation turbine.