摘要
对芳烃装置二甲苯塔重沸炉对流段炉管泄漏进行综合分析,找出了主要原因是炉子停工期间的垢下腐蚀,并提出了针对性的防护措施。
This paper makes a comprehensive analysis on the tube leakage of re-boiling furnace at convection section in xylem rectification tower of PX unit and finds out that the main reason is corrosion under scale produced in shutdown period.Then it brings forward pertinent preventive measures.
出处
《石油化工设备技术》
CAS
2010年第6期48-50,共3页
Petrochemical Equipment Technology
关键词
二甲苯塔重沸炉
对流段
炉管
垢下腐蚀
Re-boiling furnace in Xylene rectification tower
Convection section tube
Corrosion under scale
Preventive measures