摘要
分析了梧桐庄矿矿井地质条件和水文地质条件,针对矿井水矿化度高的问题,提出了回灌工程方案,对回灌工程方案从水文地质条件的可行性、回灌水处理水质的可行性、回灌量可行性、回灌方式可行性方面进行了分析研究。
Analysis is made on mine geological condition and hydro-geological condition of Wutongzhuang Mine.A back-filling engineering scheme has been put forward in connection with the issue of highly mineralized mine-water,and feasibility study and analysis have been made in terms of hydro-geological condition of the back-filling engineering scheme,back-filling water quality treatment,back-filling water volume,and back-filling method.
出处
《中国煤炭》
北大核心
2010年第11期111-113,共3页
China Coal
关键词
矿井水
矿化度高
回灌处理
水文地质条件
水质
回灌量
回灌方式
highly mineralized mine-water
back-filling treated
hydro-geological condition
water quality
back-filling volume
back-filling method