摘要
三维可视化技术广泛地应用在矿业软件中,为解决计算机编制地下金属矿山生产计划的问题提供了有效途径。分析了地下金属矿山生产计划的编制要求,指出其关键技术,主要论述了DIMINE矿业软件地下金属矿山生产计划编制模块的功能与原理,并通过工程实例验证系统性能。结果表明,该系统可行、有效,能够将矿山数字建模与生产计划编制真正结合,灵活适应不同矿山的要求。
The 3D visualization technology,which is widely applied in mining software,offered an effective way to solve the problem of production scheduling preparation of underground metal mine by computer.The paper discussed the requirements of the scheduling preparation and put forwards its key techniques.Then the function and principle of production scheduling module of DIMINE mining software were mainly discussed.The performance of system was verified by a project case.The results showed that the system is available and effective,which could combine the production schedule preparation with the digital modeling of mine to flexibly meet the requirements of different mines.
出处
《金属矿山》
CAS
北大核心
2010年第11期51-55,共5页
Metal Mine