摘要 吸收塔是火电厂烟气脱硫装置中的关键设备,以铜陵电厂2×1 000MW机组烟气脱硫装置吸收塔安装为例,介绍了吸收塔倒装工艺及其特点。由于倒装法在降低费用、缩短工期、减少高空作业量、不受场地限制等方面具有显著的优点,因而在吸收塔的施工技术中被广泛采用。 Absorption tower is served as critical equipment for desulfurizing facilities in power plant.The process and characteristics of upside-down constraction methodlogy of FGD system in 1000MW units in Tonyling Power are introduced.With its distinctive advantages,such as cost-effective,time-saving,minimizing of work at height,free from limited space,upside-down construction methodology is widely adopted in the construction of absorption tower.
作者 杨洁
出处 《电力科技与环保》 2010年第6期26-28,共3页 Electric Power Technology and Environmental Protection
关键词 火电厂 烟气脱硫 吸收塔 倒装法 coal-fired power plan FGD absorption tower upside-down construction methodology.
  • 相关文献

参考文献2

  • 1DL5007-92,电力建设施工及验收技术规范--火力发电厂焊接[S].
  • 2全国一级建造师执业资格考试用书编写委员会.机电工程管理与实务[M].北京:中国建筑出版社,2009.

共引文献1

同被引文献7

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部