杭州地铁车站纵向沉降及地基处理分析 被引量:3

Analysis of Longitudinal Subsidence and Foundation Treatment of Hangzhou Subway Station
下载PDF
导出
摘要 采用数值分析方法,针对杭州地铁1号线湘湖车站北二基坑的地基沉降变形与加固处理方案进行分析。通过调整基坑底加固的长度,使得湘湖站主体结构在各个区域、不同时间段的沉降变化规律能够满足地铁线路纵坡、轨道、限界等的要求,可为软土地区塌陷基坑的重建提供设计参考。 Subsidence and reinforcing of North No.2 foundation pit at Xianghu Station on Line 1 of Hangzhou subway were analyzed by numerical method with the subs-idence history of the main station structure in different areas and different periods acquired.It was shown from the results that the requirements for longitudinal grade,track and clearance of the line could be satisfied by adjusting the reinforcing length of the foundation pit bottom.This work might be helpful for the reconstruction of collapsed foundation pit in soft soil regions.
出处 《都市快轨交通》 2010年第6期75-80,共6页 Urban Rapid Rail Transit
关键词 城市轨道交通 杭州地铁 车站 塌陷基坑 基坑重建 沉降 地基处理 urban rail transit Hangzhou subway subway station collapsed foundation pit reconstruction subsidence
  • 相关文献

参考文献6

  • 1华东建设公司.杭州地铁1号线湘湖站北二段基坑恢复方案岩土工程勘察专题报告[R].杭州,2008.
  • 2GB50517-2003地铁设计规范[s].北京:中国计划工业出版社.2003.
  • 3中铁四局集团第六工程有限公司.湘湖站高压旋喷桩试桩检测报告[R].杭州,2008.
  • 4工程地质手册编写委员会.工程地质手册[M].北京:中国建筑工业出版社.2007.
  • 5GB50007--2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002:94—96.
  • 6DB33/1001--2003浙江省标准建筑地基基础设计规范[s].杭州:浙江大学出版社,2003.