某高加三通阀自动切换失效的原因及技控措施 被引量:1

The Cause & Technicl Control Measures of Failing to Switch Automatically of a Three-way Value in a High Pressure Heater
下载PDF
导出
摘要 某电厂2#机高压加热器进口三通阀(进口阀门)出现不能正常切换等问题,为保证同类问题的及时解决和确保机组的正常运行,通过对特殊阀门的结构分析,明确了三通阀结构部件的作用与工作原理,提出了处理方案。通过与对阀门解体对比发现,两者吻合,说明了处理方案的可行性,及时消除了缺陷,保证了机组安全运行。 When three-way valve(inlet valve) of No.2 high pressure heater can't switch normally our in a power plant, the main cause can not be determined when it happened immediately.In order to ensure this problem can be solved in time when there are similar incidents in the future and the normal operation of units,we sfhould have deep analysis for this special valve in the structure,know each structural component's role and work of three-way valve gradually.Comparing the actual analyzing and the disintegration of the valve,we found that they fit together well.Therefore,understanding the valve's structure and working principle fully can have a lot of help for analysising the valve's work status and adverse reactions,so we can eliminate the defects timely and ensure the safe operation of unit.
作者 郭英明
出处 《电力学报》 2010年第5期430-431,435,共3页 Journal of Electric Power
关键词 发电厂 高压加热器 进口通阀 自动切换 power plant high pressure heater valve structure automatic switching
  • 相关文献

参考文献1

  • 1应静良.电站常用阀门手册[M].中国电力出版社,2000.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部