摘要
结合华能瑞金有限公司2×350MW超临界机组的设计优化经验,指出火电厂厂区布置、土建工程、工艺系统、控制系统等设计优化中存在的问题,给出了完善火电厂设计优化的具体要求及建议,对新建机组的建设具有一定的指导意义。
Combining with experiences obtained from the design optimization in 2×350MW supercritical units of Huaneng Rinjin Power Plant during building,the problems existing in design optimization of power plant,such as the plant layout,the civil engineering,the process system and the control system etc.,have been pointed out,the concrete requirements and recommendations for perfecting the design optimization of power plant being also given,which have guiding significance for the construction of newly constructed units.
出处
《电力学报》
2010年第5期432-435,共4页
Journal of Electric Power
关键词
火电厂
土建工程
厂区布置
设计优化
power plant
design optimization
plant layout
civil engineering