阐述了高压直流输电工程直流线路瞬时接地故障试验的设计与实施,从试验目的和原理、试验设备、试验准备、试验操作、安全措施五个方面详细地讲解了如何去设计安排试验。
This article focuses on design and implementation of artificial ground fault about DC line transient test in HVDC project.It discusses how to design and implement in five sides: purpose of the experiment, preparation before test, test devices and composition of operation, and system recovery, and security measures.