摘要
对重庆开县新集镇移民建筑工程的强夯地基施工质量监理控制要点进行了总结。强夯施工前准备阶段的监理内容包括:研究和审查图纸及地勘资料;认真学习规范、规程,增加专业知识储备;审核施工单位资质及人员资格;审核施工方案;施工场地准备;施工设备安装调试检查;测量放线控制;组织现场试夯;编制监理实施细则及旁站方案,并做好监理程序交底。强夯施工过程中的监理内容包括:检查开工条件和施工准备情况;督促承包人按操作规程作业;详细检查承包人对施工过程中的各项参数记录情况;出现偏差应督促承包人及时处理。强夯施工完成后的监理内容包括:施工场地清理与成品保护;施工质量的检验;资料归档。
We summarize the key control points in quality supervision of dynamic consolidation construction for resettlement in Xinji Town,Kai County of Chongqing City.In the preparing stage of dynamic consolidation construction,the supervision content includes researching and reviewing drawings and geological exploration data,studying standards and regulations,enlarging the knowledge reserving,checking the qualification of construction units and personnel,auditing the construction scheme and field preparation,testing and debugging the construction equipment,controlling the measurement,organizing the field trial consolidation,compiling detailed regulations of supervision implementation and site supervision scheme,explaining supervision process.The supervision during construction of dynamic consolidation includes checking the starting conditions and construction preparations,urging the contractor to follow the working regulations,checking the recording status of all kinds of indexes during the construction process,helping and urging the contractor to deal with the errors or emergencies occurred.The supervision after dynamic consolidation construction includes clearing up the field and protecting the products,checking the construction quality,sorting out the data.
出处
《人民长江》
北大核心
2010年第23期102-104,108,共4页
Yangtze River
关键词
强夯地基
质量监理
控制要点
移民工程
dynamic consolidation construction
quality supervision
key control points
resettlement