摘要 将寿命预计、成本最优与经济性分析相结合,提出了系统、综合的预防性维修周期确定方法。应用双参数威布尔分布模型确定某型号触点开关的平均寿命;以成本最小为目标,建立了全部定时更换模型以及工龄定时更换模型,得到了该型号触点开关的预防性更换周期,根据预防性更换周期的结果,确定了8种备选方案;应用经济性分析模型,按照该模型对文中提出的8种方案进行了经济性分析,得出了成本最优以及经济性最优的备选方案。 An approach to determine the preventive maintenance cycle was proposed in consideration of the lifetime,optimal cost and economy.Two parameters Weibull distribution was used to calculate the lifetime of contact switch.The block replacement model and age replacement model were built with the objective of optimal cost,and the preventive replacement cycle was accounted.Eight proposals for preventive replacement cycle were given.Economy model was applied to assess those proposals and the optimal proposal was confirmed.
作者 石颉
出处 《核动力工程》 EI CAS CSCD 北大核心 2010年第6期106-112,共7页 Nuclear Power Engineering
关键词 核电厂 触点开关 平均寿命 成本最优 预防性维修周期 经济性分析 Nuclear power plants Contact switch Mean lifetime Cost optimum Preventive maintenance cycle Economical analysis
  • 相关文献

参考文献6

  • 1Shi Jie, Yao Jianlin, Wang Yongnian. Analysis on Contact Failure of Instrument and Control Switch in Nuclear Power Plant[C]. 16th IEEE International Symposium on the Physical and Failure Analysis of Integrated Circuits,2009: 101-104.
  • 2石颉,姚建林,王永年,施海宁,涂丰盛.核电站仪控开关触点接触失效分析[J].低压电器,2009(9):57-60. 被引量:7
  • 3石颉,谌登华,施海宁,涂丰盛.核电站仪控开关可靠性数据分析与处理[J].核动力工程,2010,31(2):54-57. 被引量:11
  • 4陈云翔.可靠性与可修性工程[M].北京:国防工业出版社,2007:143-170.
  • 5Jayabalan V, Dipak Chaudhuri. Cost Optimization of Maintenance Scheduling for a System with Assured Reliability[C]. IEEE Transactions on Reliability, 1992.
  • 6Chang Hoon Lie, Young Ho Chun. An Algorithm for Preventive Maintenance Policy[C]. IEEE Transactions on Reliability, 1986, R-35(1).

二级参考文献15

共引文献19

同被引文献4

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部