摘要
目的对深圳市某游泳场所工程竣工卫生安全控制设施及效果进行卫生学评价,为卫生监督部门卫生审核提供技术依据。方法依照卫生学评价通则对游泳场所竣工现况进行卫生学调查和工程卫生分析,检测游泳池水水质卫生指标。结果该游泳场所的水质循环净化消毒工艺、泳场布局与设备设置、消毒与卫生设施的设置基本符合游泳场所卫生规范;3份泳池水质各12个检测项目的检测结果均在标准范围内,合格率为100%;但泳场未配备泳池水、浸脚池水的余氯自检设备。结论该游泳场所的卫生安全控制设施基本符合游泳场所卫生规范,卫生控制效果符合标准要求;但泳池水、浸脚池水余氯自检的管理措施有待改善。
Objective To evaluate the safety control facilities and effectiveness of completed project of the swimming place,and provide technical basis for health supervision departments.Methods Hygiene investigation and engineering hygiene analysis were carried out,water quality and other health indicators of the swimming pool were evaluated.Results The contents of purification cycle of disinfection processes,swimming pool layout and device settings,disinfection and sanitation facilities were basically in line with the sanitation criterion of swimming place.12 test indexes of 3 swimming pools all accorded with national standards,the qualified rate was 100%,but residual chlorine self-inspection equipments for pool water and foot basin water for disinfection weren't installed.Conclusion Health and safety control facilities of the swimming place are basically in line with the requirements of national standards,but the self-inspection measures on residual chlorine of the pool water and foot basin water for disinfection should be improved.
出处
《中国卫生工程学》
CAS
2010年第6期447-448,451,共3页
Chinese Journal of Public Health Engineering
关键词
游泳场所
工程竣工
卫生学评价
Swimming place
Completed project
Hygiene evaluation