摘要
针对铁路工程投标报价工作实践,对经评审的最低投标价法进行了介绍,探讨了采用经评审的最低投标价法时的报价编制要点,以指导投标企业提高经营管理水平和竞争力。
In view of bidding quotation practice for railway engineering, this paper describes lowest bidding price method after review, discusses the quotation compilation points with lowest bidding price after review, so as to guide bidding and tendering enterprises to improve management level and competitiveness.
出处
《山西建筑》
2011年第2期235-236,共2页
Shanxi Architecture
关键词
铁路工程
投标报价
经评审的最低投标价法
编制方法
railway engineering, bidding quotation, lowest bidding price after review, compilation method