摘要
简要归纳了CRTSⅠ型双块式轨枕预制劳动定额编制原则,详细介绍了其劳动定额编制的步骤,通过测定了较为合理的劳动定额,在为今后施工生产提供指导的同时,也使生产成本得到了有效控制。
The paper sums up the compilation principle for the prefabrication labor quota of CRTS I type bi-block sleeperswith, introduces the steps of the labor quota compilation, and provides the direction for future construction and undertakes the effective control over the production costs by measuring the more reasonable labor quota.
出处
《山西建筑》
2011年第1期249-250,共2页
Shanxi Architecture
关键词
双块式轨枕
预制
劳动定额
编制
bi-block sleeperswith, prefabrication, labor quota, compilation