摘要
本文研究河流主航道上大型水利枢纽的发电-航运优化日运行方式,提出决规划阶段问题和运行阶段问题的两个数学模型及其求解方法。以长江三峡-葛洲坝梯级水电站为实例进行了计算,得出初步结果。
The optimal daily operation manner of the generating electricity and navigation about large scale water conservancy project on the river main channel is studied in this paper. Two mathematical models and their solutions about planning stage and operating stage problems are presented. ThreeGorges and Gezhouba cascade hydropower stations are taken for instunce, two models arc applied to based on the real situation and date of the cascade stations. A set of initial results are obtained.
出处
《水电能源科学》
北大核心
1990年第1期49-58,共10页
Water Resources and Power
关键词
水利枢纽
发电
航运
管理
优化
operation manner, short time optimization, power generating, navigation, unstable flow