缅甸瑞丽江一级水电站至达贡山镍矿输电线路拼抢工期的若干措施

Several Measures to Strive for Punctuality in the Transmission Line Project from Myanmar Shweli First-class Hydropower Station to Dagon Hill Nickel Mine
下载PDF
导出
摘要 文章阐述了缅甸瑞丽江一级水电站至达贡山镍矿220 kV送电线路工程拼抢工期的若干措施,尤其指出大件材料在雨季前运输到现场材料站、将组织不力的施工分包商断然换下、对雨季材料中运的路面进行处理等措施的施行,能使工程满足合同对工期的要求。实践表明,这些非常措施对赢得工程工期是行之有效的。 The article illustrates several measures to Strive for Punctuality in the 220 kV Transmission Line Project from Myanmar Shweli First-class Hydropower Station to Dagon Hill Nickel Mine,and points out especially that bulky materials should be sent to material station before rainy season,construction subcontractors who could organize well should be dismissed and measures to cope with road surface in rainy seasons.Therefore the project can meet the time requirement in the contract. In practice,it has shown that these unusual measures are effective to win time.
作者 梁跃清
出处 《企业科技与发展》 2011年第1期52-54,共3页 Sci-Tech & Development of Enterprise
关键词 缅甸 输电线路 拼抢工期 措施 Myanmar transmission line strive for punctuality of project measures
  • 相关文献

参考文献5

二级参考文献5

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部