浅析建筑企业施工管理费费率的确定 被引量:2

Reasonable Identity of Rate of Overhead Costs in Construction Company
下载PDF
导出
摘要 建设工程工程量清单计价规范(GB50500-2008)已于2008-12-01正式实施,规范对清单模式下的投标抱价活动中相关术语做了相应界定,其中将标底正式更正为招标控制价。招标控制价的界定,为招投标活动的合理有效进行铺平了道路。对投标人来说,接踵而来的是投标报价让利问题。如果投标人对自己施工过的项目的管理费用没有具体的量化指标,在施工竟标中将处于劣势。本文站在投标人立场,讨论施工企业管理费率的合理确定问题。 Code of valuation with bill quantity of construction works (GB50500-2008) has been carried out since 12 1st, 2008. The code defines some items in bidding including bidding controlled-price. So the bidding matters will be controlled successfully in some sense. And then, the key matters of bidding are how to solve cutting-off of bidding price. Construction company will lie in falling situation so long as any construction company do not know how to define quantified index about cutting-off in bidding price. In order to support some company to solve this kind of problem, the author will talk about overhead costs.
作者 万长虹 杨明
出处 《价值工程》 2011年第2期95-96,共2页 Value Engineering
基金 江西农业大学校基金项目-建筑工程工程量清单计价管理研究-2532
关键词 建设工程工程量清单计价规范(GB50500-2008) 公司管理费 现场管理费 code of valuation with bill quantity of construction works(GB50500-2008) home office overhead costs job overhead costs
  • 相关文献

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部