基于配置的ETO产品的多设计项目快速规划方法 被引量:1

Configuration-based Multiple Design-Projects Rapid Planning for ETO Product
下载PDF
导出
摘要 大批量定制的模式下企业的ETO产品多设计项目受到时间、资源等多重约束,项目规划效率不高。通过在项目规划阶段建立基于产品族的项目主模板,增加节点约束集、时间约束集、资源约束集,简化规划过程复杂迭代的搜索过程,实现多项目环境下项目实例的有效快速配置。以在多项目并行环境下的ETO产品工业汽轮机设计项目快速规划为例进行了验证,表明此快速规划方法在多项目环境下快速规划新项目方面起到很好的作用。 To improve the efficiency of project planning for Engineer to Order (ETO) product design projects in the mass customization mode, a rapid project planning method based on configuration was proposed. Traditional project planning methods performed less efficiently because of the influence of time, resources, and other uncertain constraints in multiple ETO product design projects. A Master Project Work Breakdown Structure (M-WBS) template based on product family was constructed, so as to incorporate sets of time-constraint, resource-constraint and node matching rules. Consequently, application of M-WBS template simplifies complexity of iterative search algorithm comparing with the bound variables of constraints in project planning processes. This method within M-WBS template was applied in multiple ETO product design projects environment to achieve an effective and rapid configuration of projects. Finally, this method was evaluated in ETO parallel-projects environment of an industrial steam turbine enterprise. Multiple design projects of industrial steam turbine were planned successfully. Result illustrates that the method performed feasibly and operationally.
出处 《机械工程师》 2010年第12期36-39,共4页 Mechanical Engineer
基金 国家自然科学基金项目(50975255) 国家"863"高技术研究发展计划资助项目(2009AA04Z146) 中央高校基本科研业务费专项资金资助项目(2010QNA4025)
关键词 产品设计 项目配置 项目规划 ETO产品设计 product design project configuration project planning ETO product design
  • 相关文献

参考文献6

  • 1HADDAD O B,et al.Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources[J].Computational Optimization and Applications,2008,47(1):97-128.
  • 2YOSHIMURA M,et al.Decision-making support system for human resource allocation in product development projects[J].International Journal of Production Research,2006,44(5):831-848.
  • 3HEIMERL C,et al.Scheduling and staffing multiple projects with a multi-skilled workforce[J].OB Spectrum.2010,32(2):343-368.
  • 4ZENG F S,et al.Study on product configuration based on product model[J].The international Journal of Advanced Manufacturing Technology,2007,33(7-8):766-771.
  • 5Anavi-Isakow S,Golany B.Managing muhi-projeet environments through constant work-in-process[J].international Journal of Project Management,2003,21(1):9-18.
  • 6苏少辉,纪杨建,祁国宁,陈国金.面向ETO产品大批量定制的项目规划方法[J].浙江大学学报(工学版),2009,43(10):1833-1840. 被引量:1

二级参考文献9

  • 1李贵春,李从东,李龙洙.MC供应链的集成优化理论与方法[J].天津大学学报(社会科学版),2005,7(4):280-284. 被引量:5
  • 2WANG Juite. A fuzzy project scheduling approach to minimize schedule risk for product development [J]. Fuzzy Sets and Systems, 2002, 127(2): 99 - 116.
  • 3徐志勇.航空产品项目计划及监控技术研究[D].西安:西北工业大学,2006.
  • 4NICHOLAS J M.面向商务和技术的项目管理原理与实践[M].蔚林巍,译.北京:清华大学出版社,2003:145-146.
  • 5WILEY V D. DECKRO R F, JACKSON J A. Optimization analysis for design and planning of multi-project programs[J]. European Journal of Operational Research, 1998, 107(2): 492-506.
  • 6HARTMANN S, SPRECHER A. A note on hierarchi- cal models for multi-project planning and scheduling[J]. European Journal of Operational Research, 1996, 67(2) 377 - 383.
  • 7LOVA A, TORMOS P. Analysis of scheduling schemes and heuristic rules performance in resource- constrained multi-project scheduling [J ]. Annals of Operations Research, 2001,102 ( 2 ) : 263 - 286.
  • 8陈昆玉,覃正.大规模定制:企业竞争的新范式[J].科学学与科学技术管理,2002,23(2):49-51. 被引量:15
  • 9邱进冬,顾新建.面向大规模定制的项目管理研究[J].成组技术与生产现代化,2003,20(1):34-37. 被引量:7

同被引文献7

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部