摘要 某水利枢纽工程导流洞堵体混凝土施工具有工期短、强度大、负温施工期长和自然降温困难等特点,针对上述特点,经过仔细的分析论证,导流洞封堵体的施工控制参数较原设计值进行了适当提高。根据监测资料显示,堵体混凝土运行性状良好,满足设计功能要求,对同类地区水工隧洞堵体的设计与施工具有一定的借鉴意义。 The construction of the bulkhead of the diversion tunnel for a water control project has the characteristics such as short construction period,more working intensity,long period of construction under the subzero temperature and difficult to lower temperature naturally;for which the control parameters for the construction of the bulkhead are properly increased compared with the original design values after the careful analysis and demonstration concerned.The monitoring data show that the concrete of the bulkhead has a better operation behavior to satisfy the requirement on its designed function,and then has a certain reference value for the bulkhead of the hydraulic tunnel within the similar region.
出处 《水利水电技术》 CSCD 北大核心 2010年第12期50-53,57,共5页 Water Resources and Hydropower Engineering
关键词 导流洞 封堵体 设计 施工 水利枢纽工程 diversion tunnel bulkhead design construction water control project
  • 相关文献

参考文献3

共引文献35

同被引文献23

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部