摘要
本文详细介绍了某厂4台300MW中储式燃煤机组在"两个实施细则"实施过程中影响一次调频品质的4个主要因素,提出了改善一次调频品质的9项措施。措施实施后,某厂一次调频被考核的电量每月由原来最高的1200MWh降到现在的0MWh,为电厂争取了最大的一次调频利益,证明了本文提高一次调频品质措施的有效性和实用性,值得应用推广。
This article introduced in detail in some factory 4×300MW units storage pulverizing system coal-burning unit influence primary frequency modulation quality 4 primary factors which in the implementation process exposes in "two regulations", proposed improves primary frequency modulation quality 9 measures. After measure implementation, a some power plant primary frequency modulation the electric quantity which inspects from highest 1200 MWh is fallen originally every month to present's 0 MWh, has striven for a biggest primary frequency modulation benefit for the power plant, had proven this article enhances Primary frequency modulation quality measure the validity and the usability, is worth applying the promotion.
出处
《自动化博览》
2010年第11期78-80,共3页
Automation Panorama1
关键词
两个细则
中储式制粉系统
机组
一次调频
控制策略
Two regulations
Storage pulverizing system
Unit
Primary frequency modulation
Control policy