摘要
指出直流系统是变电站一个重要的组成部分,变电站投入运行后,直流系统将不间断地为运行设备提供电源,不能停电。主要介绍了变电站投运前,直流系统需要着重验收的几个关键点,为变电站投产后直流系统的稳定运行提供保障。
It is stated that as an important part in transformer substation,after substations are put into operation,DC system has to supply uninterrupted power for operating equipment.This paper mainly introduces the key points on the acceptance check of DC system before substations are put into operation,which greatly ensures the stable operation of DC system.
出处
《山西电力》
2010年第6期18-19,23,共3页
Shanxi Electric Power
关键词
变电站
直流系统
验收
投产
transformer substation
DC System
acceptance check
production