摘要 对外高桥造船有限公司船坞工程的锚拉式板桩坞壁结构监测成果进行分析研究,发现坞壁位移的主要原因是施工期墙前土体的蠕变变形。根据分析研究结果,在#2船坞接长改造工程中,采用了设置临时钢支撑、改进锚碇结构等措施,有效地减少坞壁位移,同时使锚碇施工工序不影响坞室开挖工序,提高了效率,保证了施工质量,达到了预期目标。设置临时钢支撑限制坞壁位移的方法在船坞工程中首次使用,为同类工程设计积累了经验。 The analysis and study of the anchored sheet pile retaining wall of the Waigaoqiao Shipbuilding Co.dock engineering show that the creep deformation in front of the wall during construction is the major cause of the dock wall displacement.According to the results,several improved methods were taken in the expansion project of 2nd dock,including temporarily setting steel support,improving the anchored structure design,etc.,so that the dock wall displacement was effectively reduced and the dock excavation process was not influenced by the anchorage construction process.The method of temporarily setting steel support to reduce the dock wall displacement was firstly used in the dock project and it has accumulated significant experience for the similar projects design.
出处 《水运工程》 北大核心 2010年第12期31-36,共6页 Port & Waterway Engineering
基金 上海市科学技术发展基金(08201201103)
关键词 船坞工程 锚拉式板桩坞壁结构 位移 dock project anchored sheet pile retaining wall of the dock displacement
  • 相关文献

参考文献3

二级参考文献7

  • 1DGJ08-11-1999.地基基础设计规范[S].[S].,..
  • 2JTJ292-98.板桩码头设计与施工规范[S].[S].,..
  • 3JTJ252-87.干船坞设计规范[S].[S].,..
  • 4.干船坞设计规范[S].[S].,1990..
  • 5第九设计院 上海港务局 上海市基础工程公司.地下连续墙结构静力计算[R].,1978..
  • 6维亚洛夫[苏]CC.土力学的流变原理[M].北京:科学出版社,1987..
  • 7Piling Handbook SEVENTH EDITION 1997 Published by British Steel PLC Sections Plates&Commercial Steels Piling Technial Services.

共引文献13

同被引文献11

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部