期刊文献+

新疆某水电站施工导流设计 被引量:4

Construction diversion design for a hydropower station in Xinjiang
下载PDF
导出
摘要 介绍新疆北部某水电站的工程概况,通过对坝址及流域洪水、泥沙、径流和冰情等水文,气象条件的分析,提出了混凝土面板堆石坝施工导流。 An introduction was made on the general of a hydropower station located in the Northern area of Xinjiang.Based on analysis of the hydrological and meteorological conditions of the dam site and river basin including flood,sediment,runoff and ice regime etc.,the Construction diversion and river closure design scheme of concrete slab rockfill dam was put forward.
出处 《广西水利水电》 2010年第6期38-40,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 施工导流 截流 导流洞 设计 Construction diversion river closure diversion tunnel design