摘要
某电站因水导轴承和推力轴承瓦温过高而进行年度大修工作,根据检修前对机组采集的数据及机组实际运行工况,从机组安装的工艺质量、设备结构、设计制造方面对瓦温升高的原因进行缜密分析和深入研究,并提出处理方案。实施后,机组运行正常。
Major repair was conducted at a power station due to abnormal temperature rise of guide and thrust bearing bushes.According to the monitoring data and actual operation status of turbine generator unit,analysis and study of the causes was conducted in respects of erection technique and quality;structure,design and manufacture of device,based on which the solution was put forward and implemented,rendering normal operation of unit.
出处
《广西水利水电》
2010年第6期71-73,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水导轴承
推力轴承
瓦温高
分析
处理
Turbine guide bearing
thrust bearing
abnormal temperature rise of bearing bush
analysis
solution