摘要
根据复合顶板推跨型冒顶事故的机理,通过在郑煤团超化矿应用倒拉杆、对接抬棚和提高支柱初撑力措施,成功地解决了复合顶板下炮采放顶煤工作面支架稳定性问题,并提出要根据现场空间、回采工艺。
Abstract The paper analyzes the mechanism of roof-fall due to
support trundling down under complex roof. It proposes several methods to increase the roof
stability of mining face using blasting top-coal-caving such as using special bars connecting
supports, jointing support bedplate together and increasing prop setting load.
出处
《矿山压力与顶板管理》
1999年第2期52-53,共2页
Ground Pressure and Strata Control