摘要
根据陶庄煤矿薄煤层复合顶板工作面初次放顶的实践,掌握了工作面顶板管理必须控制岩层的范围及其运动规律。
AbstractThe manner of ground pressure and strata control under complex and thin coal roof in
Tao-zhuang coal mine is presented, and the technique of initial top-coal caving and effects of it in
such geological condition is also introduced.
出处
《矿山压力与顶板管理》
1999年第2期56-59,共4页
Ground Pressure and Strata Control