期刊文献+

临沂国际金融大厦大体积混凝土施工质量控制 被引量:1

Quality Control of Large Volume of Concretein Construction of the International Financial Mansion of Linyi City
下载PDF
导出
摘要 临沂市国际金融大厦基础筏板在冬季连续浇注3850m3混凝土施工中,从配合比的设计、温差、温度、混凝土的浇注技术及养护等方面,采取有效措施,成功地控制了混凝土温度裂缝的产生。 In construction of foundation plate of the Linyi International Financial Mansion, 3850m3 of concrete were poured into continuously in winter. Because many efbective management measures were taken, such as, the ratio of concrete components, temperature, defference in temperature, the pouring technique and maintenance of eoncrete, etc., cracks in concrete credted by the elfect of temperature were sontroled successfully.
出处 《山东矿业学院学报》 CAS 1999年第2期83-85,共3页 Journal of Shandong University of Science and Technology(Natural Science)
关键词 大体积混凝土 裂缝 施工质量控制 大厦 large volume of concrete crack difference in temperature measure
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部