摘要
该文依托上海某一合流制排水系统达标改造工程为背景,深入研究了该工程的特点、建设要求和现场情况。在收集分析相关数据的基础上,对改造过程中遇到的实际情况和解决措施通过进行总结,并就合流制排水系统的初期雨水污染提出解决方案,对调蓄池的运行方式提出适合的建议和措施。
Taking a combined sewer system up-to-standard reconstruction project of Shanghai as the background,the article deeply studies the characteristic,construction requirement and field condition of this project.On the basis to collect and analyze the relative data,the article summarizes the practical conditions met in the course of reconstruction and the solving measures,puts forward the solving scheme for the primary-stage rainwater pollution of the combined sewer system,and gives the suitable suggestions ad measures for the operation mode of pre-processing storage tank.
出处
《城市道桥与防洪》
2010年第12期73-76,共4页
Urban Roads Bridges & Flood Control
关键词
合流制排水系统改造
初期雨水
调蓄池
面源污染控制
reconstruction of combined sewage system,primary rainwater,regulating storage tank,control of widespread pollution