期刊文献+

BOT模式运营中遇到的问题与对策探讨 被引量:1

Problems from Operations of BOT Model and Countermeasures
下载PDF
导出
摘要 文章介绍了BOT模式给政府部门、投资经营者和项目使用者带来的问题,提出了解决BOT项目困境的方法,分析了PPP-BASED BOT项目融资的优越性。 The problems which were brought to government departments,investment managers and users by BOT model were discussed in this paper.Some solutions were put forward,and the advantages of the PPP-BASED BOT project financing were analyzed.
作者 魏慧
出处 《江苏建筑》 2010年第6期107-109,共3页 Jiangsu Construction
关键词 BOT模式 PPP-BASEDBOT模式 问题 对策 BOT PPP-BASED BOT problems solutions
  • 相关文献

参考文献3

二级参考文献18

  • 1Chen, C., Doloi, H. BOT application in China: driving and impeding factors[J]. International Journal of Project Management, 2008, 26(4): 388-398.
  • 2Chan, W. T., Chen, C., Messner, J. I.,et al. Interface management for China's build-operate-transfer projects [J]. ASCE: Journal of Construction Engineering and Man age ment, 2003,131 ( 6 ):645-655.
  • 3Li, B. Akintoye, A., Edwards, P. J., Hardcastle, C. Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI proeurement for construction projects in the UK: findings from a questionnaire survey[J]. Engineering, Construction and Architecture Management, 2005, 12(2): 125-148.
  • 4Chen, A., Subprasom, K. Analysis of regulation and poli ey of private toll roads in a build-operate-transfer scheme under demand uncertainty[J]. Transportation Research Part A, 2007, 41: 537-558.
  • 5Meng, X. Guarantees for contractor's performance and owner's payment in China[J]. ASCE: Journal of Construction Engineering and Management, 2002, 128( 3 ): 232-237.
  • 6Zhang, X. Q. Critical success factors for public private partnerships in infrastructure development[J]. ASCE: Journal of Construction Engineering and Management, 2005, 131 ( 1 ): 3-14.
  • 7Li, B. Akintoye, A., Edwards, P. J., Hardcastle, C. Critical success factors for PPP/PFI projects in the UK construction industry[J]. Construction Management and Economics, 2005, 23: 459-471.
  • 8Kumaraswamy, M. M., Anvuur, A. M. Selecting sustainable teams for PPP projects[J]. Building and Environment, 2008, 43(6): 999-1009.
  • 9Akintoye, A., Beck, M., Cliff, H.,et al. The financial structure of private finance initiative projects [C]. Proceed ings: 17th ARCOM Annual Conference, Salford, 2001, 1: 361-369.
  • 10Pessoa, A. Public-Private Partnerships in developing countries: are infrastructure responding to the new ODA strategy? [J]. Journal of International Development, 2008 ( 20 ):311-325.

共引文献23

同被引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部