摘要
介绍了某基坑水泥土搅拌桩加土钉联合支护方案,计算结果表明该方案各个指标满足基坑稳定性要求。监测显示基坑水平变形小,整体结构未发生破坏。
It introduces the supporting scheme of cement mixed piles and soil nails.The results by calculation for support structure of foundation pit indicate that every indices are up to the standard of the stability.The construction monitoring verifies the horizontal deformation is small,the whole structure will not be destroyed.
出处
《江苏建筑》
2010年第B12期51-53,共3页
Jiangsu Construction
关键词
软土基坑
土钉
水泥土墙
支护设计
foundation pit in soft soil
soil nail
cement-soil wall
supporting scheme design