在水电工程施工进度计划编制中,通过工程进度计划甘特图对进度完成情况进行检查是一种简单,高效的方法。针对水电施工甘特图作业数量多,作业存在多期情况导致绘制困难的缺点,基于ASP(Active Server Pages动态服务器主页)技术,研究出一种生成多期作业甘特图过程的算法,可以动态生成具有多期作业的甘特图,使水电工程施工进度计划编制更加快速、高效。实际运行效果表明,该甘特图绘制过程具有良好的交互性和较快的响应速度。
In the preparation of hydropower construction progress plan,it is simple and efficient to examine the progress completion condition by project schedule Gantt charts.ASP technology is used to overcome the difficulties of large workload and drawing troubles due to multi-phase of hydropower construction in Gantt charts,and a new algorithm to generate the process of Gantt charts for multi-phase construction is developed,which can dynamically generate the Gantt charts for multi-phase construction.The method makes the construction progress schedule formulation faster and more efficient.The practical application demonstrates that the method has good interactivity and quick response in the drawing process.
出处
《人民长江》
北大核心
2010年第24期51-54,共4页
Yangtze River
关键词
工程项目管理
甘特图
ASP
水电施工
project management
Gantt chart
ASP
hydropower construction