摘要
介绍了某电厂上汽300 MW机组高中压缸启动过程,对机组启动过程中各时段的差胀问题进行了介绍及理论分析,为上汽300 MW机组机组高中压缸启动提供了参考。
The starting process of HP and IP cylinders in 300 MW unit from Shanghai turbine Company.was introduced.During the starting process of the unit,the expansion problems in each stage were introduced and theoretically analysed.These analyses provide reference of other similar 300 MW turbines.
出处
《湖北电力》
2010年第6期34-36,共3页
Hubei Electric Power
关键词
300MW机组
高中压缸
差胀
300 MW unit
HP and IP cylinders
different expansion