摘要
本装置主要用于600MW,1000MW火电机组发电机定子汽机房吊装作业,配合汽机房原有行车,在对行车及轨道不额外加固的情况下,利用4组200t液压提升装置,完成从吊物孔起升到定子基础的就位作业。介绍该装置的设计及现场使用情况。
The equipment was used for lifting generator stators of 600MW or 1000MW units.Together with turbine hall crane and four groups of 200 t hydraulic lifting equipment,the work of lifting the stator from the hoist area to its installation position was realized without additional load on crane and rails.This article introduces the design and on-site application of the equipment.
出处
《湖南电力》
2010年第6期16-19,共4页
Hunan Electric Power
关键词
发电机定子
设计
校核
应用
generator stator
design
verification
application