摘要
江苏省启东市城市污水处理厂一期工程规模为2.5万m3/d,由上海市政设计院设计,采用orbal氧化沟工艺。2006年开始运行至今已有4年时间。在此期间对细格栅等部分设备根据实际情况进行改造,同时根据出水效果适当调整了运行参数。同时重点介绍了该厂的工艺流程、特点、运行情况及运行管理经验。
The first project of Qidong city sewage treatment plant with the scale of 25,000 m3/d,designed by the shanghai municipal design institute,using orbal oxidation ditch process has been running for 4 years since 2006.During this period,we modified the fine grid and some other equipments according to the actual situation,while adjusting the operating parameters according to the water effects,there focuses on the plant process,characteristics,operation and management experience to run.
出处
《中国资源综合利用》
2010年第12期45-47,共3页
China Resources Comprehensive Utilization
关键词
城市污水
ORBAL氧化沟
设计
运行
city sewage
orbal oxidation ditch process
design
operation