摘要
文章通过理论分析,结合国家电网电力数字同步网的现状及先进国家实现全同步的原理,针对目前我国电力数字同步网分多个同步区,无法真正实现全网同步的现象,提出了四种可行的全同步演进方案,并研究分析了四种方案的具体实施方法和设备配置。
Based on the present situation of power digital synchronous network and the experience in some advanced countries,this paper analyses the theory of digital synchronization network.Focusing on the situation in power digital synchronization network that several synchronous areas exists in one synchronization network,it put forward four full synchronous solutions.The implementation method and equipment configuration of these four solutions are also analyses in the paper.
出处
《电力系统通信》
2011年第1期37-41,共5页
Telecommunications for Electric Power System
关键词
电力数字同步网
全同步
PRC
power digital synchronization network
complete synchronization
PRC