期刊文献+

电力录波系统实时性瓶颈影响因素分析 被引量:2

Analysis on Real-Time Bottleneck Factors Influencing Power System Recording System
下载PDF
导出
摘要 电力录波系统的性能受多因素制约,以致系统实时性较难提高,鉴于此,采用改进的基于链路层网络传输方法,通过应用层直接访问网络控制器,避免了系统中对数据帧的封装与解析的冗余操作,提高了系统实时性。通过对系统中各接口数据处理时间的精确测量,可知制约电力录波系统实时性的主要因素为处理器间总线访问速度、录波文件形成效率、故障文件存储与网络传输速度,且网络传输速度为影响系统实时性瓶颈因素。通过后置存储功能,调整并行总线访问模式,优化故障录波文件形成逻辑,以减小对实时性的影响。实际测试验证了系统功能的有效性与实时性。 The performance of power recording system is restricted by many factors so that it is difficult to improve the real-time performance of recording system. For this reason, to improve real-time performance of power recording system such measures as utilizing improved link-layer based network transmission technique and directly accessing network controller via application layer to avoid the redundant operation in data packaging and unpacking are proposed. By means of accurately measuring processing time of interface data within the recording system the main restrictive factors, including bus accessing speed among processors, forming efficiency of record files, storage of fault files and network transmission speed, are revealed, and the network transmission speed is the very bottleneck factor influencing the real-time performance of the recording system. Using the measures such as postposition of storage ftmction, adjusting parallel bus access mode and optimizing forming logic of recorded fault file, the influence of these factors on real-time performance of the recording system is mitigated. Actual testing results verify the effectiveness and real-time performance of the improved recording system.
出处 《电网技术》 EI CSCD 北大核心 2011年第1期209-212,共4页 Power System Technology
基金 国家自然科学基金项目(50977016)~~
关键词 电力录波 实时性 主机接口总线 故障文件 链路层网络传输 power recording real-time performance host port interface fault recording documents link layer network transmission
  • 相关文献

参考文献22

二级参考文献185

共引文献1096

同被引文献22

  • 1陈斌,张波,丘东元,刘洋海.电能质量监测系统数据高速采集和实时处理的协调优化分析及应用[J].电网技术,2006,30(2):91-96. 被引量:16
  • 2兰海涛,司马文霞,姚陈果,杨庆.高压电网过电压在线监测数据采集方法研究[J].高电压技术,2007,33(3):79-82. 被引量:41
  • 3胡晋,金利峰,王华力,朱德生.改进时频域混合方法分析电源分配网络同步开关噪声[J].电子学报,2007,35(5):937-941. 被引量:2
  • 4张亚迪,陈柏超,畅广辉,杨东海.一种高速电力系统过电压在线监测系统的开发[J].继电器,2007,35(15):39-41. 被引量:5
  • 5Samuelsson O, Hemmingsson M, Nielsen A H, et al. Monitoring of power system events at transmission and distribution level[J]. IEEE Transactions on Power Systems, 2006, 21(2): 1007-1008.
  • 6Wu T L, Chuang H H, Wang T K. Overview of power integrity solutions on package and PCB-decoupling and EBG isolation [J]. IEEE Transactions on Electromagnetic Compatibility, 2010, 52 (2): 346-356.
  • 7Min S H, Swaminathan M. Construction of broadband passive macromodels from frequency data for simulation of distributed interconnect networks[J]. IEEE Transactions on Electromagnetic Compatibility, 2004, 46(4): 544-558.
  • 8Na N J, Choi J S, Churl S J, et al. Modeling and transient simulation of planes in electronic packages[J]. IEEE Transactions on Advanced Packagin, 2000, 2(23): 340-352.
  • 9Chun S, Swaminathan M. Modeling of simultaneous switching noise in high speed systems[J]. IEEE Transactions on Advanced Packaging, 2001, 24(2): 132-142.
  • 10Kang H, Kim H. A localized enhanced power plane topology for wideband suppression of simultaneous switching noise[J]. IEEE Transactions on Electromagnetic Compatibility, 2010, 52(2): 373-380.

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部