唐钢二炼钢厂自1995年12月8日实现全连铸生产以来,为降低连铸机设备的事故率,提高连铸机设备的完好率及可开动率,保证铸机设备正常运转,实现稳产高产,全厂六台连铸机组实施了点检定修工作,本文对此进行了详细全面地论述。
The full continus csting production had been attained for two and halt yesrs from 8th Dec, 1995 in the second steel plant of Tangshan ton and Steel Company. This paper describes in detail that the point examination and regular overhaul of six continuous castings machines are done well for reducing failure rate, increasing operating time rate and attlaining high and stable production.